{"schemaVersion":"1.0","canonicalUrl":"https://northcarolinai.com/data-centers/dc-blox-high-point-proposal","packetUrl":"https://northcarolinai.com/diligence/dc-blox-high-point-proposal","reviewDate":"2026-11-18","project":{"slug":"dc-blox-high-point-proposal","name":"DC BLOX High Point historical proposal","operator":"DC BLOX","location":"4131 Sheraton Court, High Point","locality":"Guilford County","region":"triad","kind":"campus","status":"2021 proposal — current construction and operation unverified","confidence":"B","summary":"A May 5, 2021 City of High Point and DC BLOX release announced a data-center project on 14 acres at 4131 Sheraton Court in Guilford County. Its present construction and operating outcome remain unverified.","details":["The city-hosted May 5, 2021 release identifies a 14-acre site at 4131 Sheraton Court in High Point and describes authorized project incentives in Guilford County. [high-point-dc-blox-2021]","The release’s project investment scenario includes induced customer equipment investment. It cannot be treated as developer-only capital expenditure or realized expenditure. [high-point-dc-blox-2021]","This record preserves that dated proposal. The current operator location map reviewed during this pass did not establish a High Point facility outcome, so no completion or operating milestone is assigned. [high-point-dc-blox-2021]"],"sourceIds":["census-counties","high-point-dc-blox-2021"],"capex":"Current site expenditure not verified in reviewed sources","power":"Current utility or IT capacity not verified in this review","jobs":"Current site employment not verified in reviewed sources","verifiedAt":"2026-11-18","lat":36.079065,"lng":-79.788665,"approximateLocation":true,"locationNote":"Approximate Guilford County Census Gazetteer internal point; not the campus location or parcel boundary."},"sources":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"high-point-dc-blox-2021","title":"DC BLOX and High Point Economic Development May 5, 2021 release","url":"https://www.highpointnc.gov/DocumentCenter/View/16687/DC-BLOX-and-HPEDC_Press-Release_FINAL-5-5-21","publisher":"City of High Point and DC BLOX","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}],"qualifications":["This is a public research packet, not a legal, tax, engineering or investment opinion.","A source association is not proof of a final permit, utility commitment, incentive award or completed project.","Campus and multi-site program scopes are different. Do not sum overlapping program and campus investment or capacity figures.","Publication dates, desk review dates and project milestones have different meanings. An export is not a new source verification.","Unknown or undisclosed values remain unknown; locality markers are approximate and do not establish parcel jurisdiction."],"openQuestions":[{"topic":"Land use and jurisdiction","question":"Which parcel, legal jurisdiction and land-use approvals apply to DC BLOX High Point historical proposal?","boundary":"The reviewed locality label is “Guilford County”. Confirm parcel jurisdiction independently. No locality-matched land-use reference is recorded in this packet; consult the actual governing jurisdiction.","references":[]},{"topic":"Electric service","question":"What site-specific utility service agreement, interconnection milestone and delivery date are documented?","boundary":"Reviewed disclosure: Current utility or IT capacity not verified in this review. A campus specification is not an energized utility commitment. The general utility and Commission references do not identify the serving utility, governing rate or service agreement for this particular site.","references":[{"id":"duke-large-load","url":"https://news.duke-energy.com/releases/duke-energy-protects-customers-from-data-center-costs","title":"Duke Energy proposed data-center cost safeguards","publisher":"Duke Energy","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"},{"id":"duke-ncuc-orders-8k","title":"Form 8-K: NCUC written orders in Duke Energy Carolinas and Duke Energy Progress 2025 rate cases","url":"https://www.sec.gov/Archives/edgar/data/17797/000110465926128747/tm2629986d1_8k.htm","publisher":"Duke Energy Corporation (SEC Form 8-K)","verifiedAt":"2026-11-17","accessedAt":"2026-11-17","publishedAt":"2026-11-17"},{"id":"ncuc","url":"https://www.ncuc.gov/","title":"North Carolina Utilities Commission","publisher":"North Carolina Utilities Commission","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"}]},{"topic":"Environmental and water review","question":"Which air, water and cooling records apply to the actual site and phase?","boundary":"The register does not establish a project-specific water allocation or final environmental approval.","references":[{"id":"ncdeq-air","title":"Air Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/air-quality/air-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"ncdeq-water","title":"Water Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/water-resources/water-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]},{"topic":"Investment and incentives","question":"Which site-specific investment scope and written incentive or tax-qualification records are available?","boundary":"Reviewed investment disclosure: Current site expenditure not verified in reviewed sources. A program commitment is not a campus valuation.","references":[{"id":"ncdor-data-centers","url":"https://www.ncdor.gov/taxes-forms/sales-and-use-tax/other-sales-and-use-tax-resources/important-notices-issued-sales-and-use-tax-division/important-notice-repeal-exemptions-electricity-used-datacenters","title":"Repeal of electricity exemptions for datacenters","publisher":"N.C. Department of Revenue","accessedAt":"2026-10-30","verifiedAt":"2026-10-30","publishedAt":"2026-07-23"}]},{"topic":"Employment and timing","question":"Which phase, hiring dates, job types and current employer postings are documented?","boundary":"Reviewed jobs disclosure: Current site employment not verified in reviewed sources. An announced target is not a live vacancy count. The operator references do not establish an employer affiliation, hiring commitment or project-specific training agreement for an unrelated training provider.","references":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"high-point-dc-blox-2021","title":"DC BLOX and High Point Economic Development May 5, 2021 release","url":"https://www.highpointnc.gov/DocumentCenter/View/16687/DC-BLOX-and-HPEDC_Press-Release_FINAL-5-5-21","publisher":"City of High Point and DC BLOX","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]}]}