{"schemaVersion":"1.0","canonicalUrl":"https://northcarolinai.com/data-centers/digital-realty-moores-chapel","packetUrl":"https://northcarolinai.com/diligence/digital-realty-moores-chapel","reviewDate":"2026-11-18","project":{"slug":"digital-realty-moores-chapel","name":"Digital Realty Moores Chapel campus proposal, Charlotte","operator":"Digital Realty","location":"Mecklenburg County","locality":"Mecklenburg County","region":"charlotte","kind":"campus","status":"Proposed — delivery dates preliminary; presented during Charlotte’s data-center moratorium","confidence":"B","summary":"Digital Realty presented a proposed 400 MW IT campus at Moores Chapel, on 157 acres about 10 miles west of downtown Charlotte, to the City of Charlotte’s Data Center Task Force on September 17, 2026.","details":["The presentation lists forty 10 MW data halls in two-story buildings, initial delivery expected in 2027 and the full 400 MW by the end of 2030, with closed-loop, air-cooled chillers built to support liquid cooling. It says the dates are preliminary and all information is subject to change. [charlotte-dc-task-force-2026-09-17]","The same deck notes a Duke Energy regional requirement to take part in a power-shedding program, and says Digital Realty funds all transmission and substation upgrades. Those are the developer’s statements, not utility filings. [charlotte-dc-task-force-2026-09-17]","The same deck asks the task force to vote on recommending that City Council extend Charlotte’s data-center moratorium, effective November 5, 2026, with the length left blank. The proposal is not a rezoning, permit or utility commitment. [charlotte-dc-task-force-2026-09-17]"],"capex":"Not disclosed in cited source","power":"400 MW IT capacity proposed — developer presentation","jobs":"Not disclosed in cited source","sourceIds":["census-counties","charlotte-dc-task-force-2026-09-17"],"verifiedAt":"2026-11-18","lat":35.246862,"lng":-80.833832,"approximateLocation":true,"locationNote":"Approximate Mecklenburg County Census Gazetteer internal point; not the campus location or parcel boundary. The presentation places the site about 10 miles west of downtown Charlotte and gives no parcel address."},"sources":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"charlotte-dc-task-force-2026-09-17","title":"Data Center Task Force meeting presentation, September 17, 2026 (includes Digital Realty presentation)","url":"https://www.charlottenc.gov/files/content/city/v/41/city-news/data-centers-moratorium-faqs/data-center-community-task-force-presentation-09-17-2026.pdf","publisher":"City of Charlotte","publishedAt":"2026-09-17","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}],"qualifications":["This is a public research packet, not a legal, tax, engineering or investment opinion.","A source association is not proof of a final permit, utility commitment, incentive award or completed project.","Campus and multi-site program scopes are different. Do not sum overlapping program and campus investment or capacity figures.","Publication dates, desk review dates and project milestones have different meanings. An export is not a new source verification.","Unknown or undisclosed values remain unknown; locality markers are approximate and do not establish parcel jurisdiction."],"openQuestions":[{"topic":"Land use and jurisdiction","question":"Which parcel, legal jurisdiction and land-use approvals apply to Digital Realty Moores Chapel campus proposal, Charlotte?","boundary":"The reviewed locality label is “Mecklenburg County”. Confirm parcel jurisdiction independently. No locality-matched land-use reference is recorded in this packet; consult the actual governing jurisdiction.","references":[]},{"topic":"Electric service","question":"What site-specific utility service agreement, interconnection milestone and delivery date are documented?","boundary":"Reviewed disclosure: 400 MW IT capacity proposed — developer presentation. A campus specification is not an energized utility commitment. The general utility and Commission references do not identify the serving utility, governing rate or service agreement for this particular site.","references":[{"id":"duke-large-load","url":"https://news.duke-energy.com/releases/duke-energy-protects-customers-from-data-center-costs","title":"Duke Energy proposed data-center cost safeguards","publisher":"Duke Energy","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"},{"id":"duke-ncuc-orders-8k","title":"Form 8-K: NCUC written orders in Duke Energy Carolinas and Duke Energy Progress 2025 rate cases","url":"https://www.sec.gov/Archives/edgar/data/17797/000110465926128747/tm2629986d1_8k.htm","publisher":"Duke Energy Corporation (SEC Form 8-K)","verifiedAt":"2026-11-17","accessedAt":"2026-11-17","publishedAt":"2026-11-17"},{"id":"ncuc","url":"https://www.ncuc.gov/","title":"North Carolina Utilities Commission","publisher":"North Carolina Utilities Commission","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"}]},{"topic":"Environmental and water review","question":"Which air, water and cooling records apply to the actual site and phase?","boundary":"The register does not establish a project-specific water allocation or final environmental approval.","references":[{"id":"ncdeq-air","title":"Air Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/air-quality/air-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"ncdeq-water","title":"Water Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/water-resources/water-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]},{"topic":"Investment and incentives","question":"Which site-specific investment scope and written incentive or tax-qualification records are available?","boundary":"Reviewed investment disclosure: Not disclosed in cited source. A program commitment is not a campus valuation.","references":[{"id":"ncdor-data-centers","url":"https://www.ncdor.gov/taxes-forms/sales-and-use-tax/other-sales-and-use-tax-resources/important-notices-issued-sales-and-use-tax-division/important-notice-repeal-exemptions-electricity-used-datacenters","title":"Repeal of electricity exemptions for datacenters","publisher":"N.C. Department of Revenue","accessedAt":"2026-10-30","verifiedAt":"2026-10-30","publishedAt":"2026-07-23"}]},{"topic":"Employment and timing","question":"Which phase, hiring dates, job types and current employer postings are documented?","boundary":"Reviewed jobs disclosure: Not disclosed in cited source. An announced target is not a live vacancy count. The operator references do not establish an employer affiliation, hiring commitment or project-specific training agreement for an unrelated training provider.","references":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"charlotte-dc-task-force-2026-09-17","title":"Data Center Task Force meeting presentation, September 17, 2026 (includes Digital Realty presentation)","url":"https://www.charlottenc.gov/files/content/city/v/41/city-news/data-centers-moratorium-faqs/data-center-community-task-force-presentation-09-17-2026.pdf","publisher":"City of Charlotte","publishedAt":"2026-09-17","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]}]}