{"schemaVersion":"1.0","canonicalUrl":"https://northcarolinai.com/data-centers/whitefiber-nc-2-nc-3-yadkin","packetUrl":"https://northcarolinai.com/diligence/whitefiber-nc-2-nc-3-yadkin","reviewDate":"2026-11-18","project":{"slug":"whitefiber-nc-2-nc-3-yadkin","name":"WhiteFiber NC-2 and NC-3 sites, Yadkin County","operator":"WhiteFiber","location":"Yadkin County","locality":"Yadkin County","region":"triad","kind":"campus","status":"Properties acquired — ready-for-service targeted late 2027","confidence":"B","summary":"WhiteFiber completed the $60 million cash purchase of two Yadkin County industrial properties, designated NC-2 and NC-3, through its subsidiary Enovum Data Centers Corp. It plans to retrofit them into data-center campuses.","details":["The November 3, 2026 filing describes about 120 acres and 500,000 square feet of existing warehouse space, about 55 miles from NC-1. It expects a combined minimum of 60 MW of initial gross utility capacity, potentially up to about 200 MW within seven years of closing, subject to confirmation and power availability. [whitefiber-8k-2026-11-03]","WhiteFiber targets initial ready-for-service capacity in late 2027. Customer interest so far is in non-binding letters of intent, and development spending is to be aligned with definitive customer agreements and financing. [whitefiber-8k-2026-11-03]","At the Town of Yadkinville’s September 14, 2026 board meeting, WhiteFiber representatives presented plans to retrofit acquired Unifi properties into data centers using closed-loop cooling rather than Town water, according to the signed minutes. [yadkinville-boc-2026-09-14]"],"capex":"$60M acquisition (cash) — SEC filing; development cost not disclosed","power":"Minimum 60 MW initial gross utility capacity expected; up to about 200 MW within seven years, subject to confirmation — SEC filing","jobs":"Not disclosed in cited source","sourceIds":["census-counties","whitefiber-8k-2026-11-03","yadkinville-boc-2026-09-14"],"verifiedAt":"2026-11-18","lat":36.158765,"lng":-80.665164,"approximateLocation":true,"locationNote":"Approximate Yadkin County Census Gazetteer internal point; not the campus location or parcel boundary."},"sources":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"whitefiber-8k-2026-11-03","title":"WhiteFiber, Inc. Form 8-K, Exhibit 99.1: press release of November 3, 2026","url":"https://www.sec.gov/Archives/edgar/data/0002042022/000121390026115575/ea031063901ex99-1.htm","publisher":"WhiteFiber, Inc. (SEC EDGAR)","publishedAt":"2026-11-03","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"yadkinville-boc-2026-09-14","title":"Town of Yadkinville Board of Commissioners monthly meeting minutes, September 14, 2026 (signed)","url":"https://www.yadkinville.org/sites/default/files/uploads/minutes/september-14-2026-boc-minutes_signed.pdf","publisher":"Town of Yadkinville","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}],"qualifications":["This is a public research packet, not a legal, tax, engineering or investment opinion.","A source association is not proof of a final permit, utility commitment, incentive award or completed project.","Campus and multi-site program scopes are different. Do not sum overlapping program and campus investment or capacity figures.","Publication dates, desk review dates and project milestones have different meanings. An export is not a new source verification.","Unknown or undisclosed values remain unknown; locality markers are approximate and do not establish parcel jurisdiction."],"openQuestions":[{"topic":"Land use and jurisdiction","question":"Which parcel, legal jurisdiction and land-use approvals apply to WhiteFiber NC-2 and NC-3 sites, Yadkin County?","boundary":"The reviewed locality label is “Yadkin County”. Confirm parcel jurisdiction independently. No locality-matched land-use reference is recorded in this packet; consult the actual governing jurisdiction.","references":[]},{"topic":"Electric service","question":"What site-specific utility service agreement, interconnection milestone and delivery date are documented?","boundary":"Reviewed disclosure: Minimum 60 MW initial gross utility capacity expected; up to about 200 MW within seven years, subject to confirmation — SEC filing. A campus specification is not an energized utility commitment. The general utility and Commission references do not identify the serving utility, governing rate or service agreement for this particular site.","references":[{"id":"duke-large-load","url":"https://news.duke-energy.com/releases/duke-energy-protects-customers-from-data-center-costs","title":"Duke Energy proposed data-center cost safeguards","publisher":"Duke Energy","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"},{"id":"duke-ncuc-orders-8k","title":"Form 8-K: NCUC written orders in Duke Energy Carolinas and Duke Energy Progress 2025 rate cases","url":"https://www.sec.gov/Archives/edgar/data/17797/000110465926128747/tm2629986d1_8k.htm","publisher":"Duke Energy Corporation (SEC Form 8-K)","verifiedAt":"2026-11-17","accessedAt":"2026-11-17","publishedAt":"2026-11-17"},{"id":"ncuc","url":"https://www.ncuc.gov/","title":"North Carolina Utilities Commission","publisher":"North Carolina Utilities Commission","accessedAt":"2026-10-30","verifiedAt":"2026-10-30"}]},{"topic":"Environmental and water review","question":"Which air, water and cooling records apply to the actual site and phase?","boundary":"The register does not establish a project-specific water allocation or final environmental approval.","references":[{"id":"ncdeq-air","title":"Air Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/air-quality/air-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"ncdeq-water","title":"Water Quality Permitting","url":"https://www.deq.nc.gov/about/divisions/water-resources/water-quality-permitting","publisher":"N.C. Department of Environmental Quality","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]},{"topic":"Investment and incentives","question":"Which site-specific investment scope and written incentive or tax-qualification records are available?","boundary":"Reviewed investment disclosure: $60M acquisition (cash) — SEC filing; development cost not disclosed. A program commitment is not a campus valuation.","references":[{"id":"ncdor-data-centers","url":"https://www.ncdor.gov/taxes-forms/sales-and-use-tax/other-sales-and-use-tax-resources/important-notices-issued-sales-and-use-tax-division/important-notice-repeal-exemptions-electricity-used-datacenters","title":"Repeal of electricity exemptions for datacenters","publisher":"N.C. Department of Revenue","accessedAt":"2026-10-30","verifiedAt":"2026-10-30","publishedAt":"2026-07-23"}]},{"topic":"Employment and timing","question":"Which phase, hiring dates, job types and current employer postings are documented?","boundary":"Reviewed jobs disclosure: Not disclosed in cited source. An announced target is not a live vacancy count. The operator references do not establish an employer affiliation, hiring commitment or project-specific training agreement for an unrelated training provider.","references":[{"id":"census-counties","title":"2025 Census Gazetteer county internal points","url":"https://www2.census.gov/geo/docs/maps-data/data/gazetteer/2025_Gazetteer/2025_Gaz_counties_national.zip","publisher":"U.S. Census Bureau","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"whitefiber-8k-2026-11-03","title":"WhiteFiber, Inc. Form 8-K, Exhibit 99.1: press release of November 3, 2026","url":"https://www.sec.gov/Archives/edgar/data/0002042022/000121390026115575/ea031063901ex99-1.htm","publisher":"WhiteFiber, Inc. (SEC EDGAR)","publishedAt":"2026-11-03","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"},{"id":"yadkinville-boc-2026-09-14","title":"Town of Yadkinville Board of Commissioners monthly meeting minutes, September 14, 2026 (signed)","url":"https://www.yadkinville.org/sites/default/files/uploads/minutes/september-14-2026-boc-minutes_signed.pdf","publisher":"Town of Yadkinville","verifiedAt":"2026-11-18","accessedAt":"2026-11-18"}]}]}