Segra Winston-Salem building

Segra lists its Winston-Salem building at 3310 Old Lexington Rd, Winston-Salem, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.

Source review 2026-11-18Confidence BOperator-listed colocation facility
Operator
Segra
Status
Operator-listed colocation facility
Investment disclosure
Not disclosed in reviewed facility entry
Power disclosure
6 MW — operator specification
Jobs disclosure
Not disclosed in reviewed facility entry
Record type
campus
Region
triad

Map position: Approximate Forsyth County Census Gazetteer internal point; not the campus location or parcel boundary. The street address is preserved separately from the map point.

Segra lists this facility at 3310 Old Lexington Rd, Winston-Salem, NC. [Segra]

The U.S. Census Bureau geocoder places the operator-listed street address in Forsyth County. [U.S. Census Bureau]

The operator facility sheet states 6 MW — operator specification. This is the operator’s facility specification, with no independent utility service or energized IT-load verification in this review. [Segra]

The operator describes two independent data centers within this one 120,000-square-foot building. This register keeps one building record and one stated capacity instead of duplicating either for each internal center. [Segra]

Project status and disclosures are attributed to the cited source. Announced investment is not proof of expenditure, and utility capacity is not inferred from computing or building capacity.

Diligence record

What the public record still has to answer for this record, the limits of the evidence, and the documents that control each question.

Open questions

Land use and jurisdiction

Which parcel, legal jurisdiction and land-use approvals apply to Segra Winston-Salem building?

The reviewed locality label is “Forsyth County”. Confirm parcel jurisdiction independently. No locality-matched land-use reference is recorded in this packet; consult the actual governing jurisdiction.

Electric service

What site-specific utility service agreement, interconnection milestone and delivery date are documented?

Reviewed disclosure: 6 MW — operator specification. A campus specification is not an energized utility commitment. The general utility and Commission references do not identify the serving utility, governing rate or service agreement for this particular site.

Employment and timing

Which phase, hiring dates, job types and current employer postings are documented?

Reviewed jobs disclosure: Not disclosed in reviewed facility entry. An announced target is not a live vacancy count. The operator references do not establish an employer affiliation, hiring commitment or project-specific training agreement for an unrelated training provider.

Evidence gaps and reuse limits

  • This is a public research packet, not a legal, tax, engineering or investment opinion.
  • A source association is not proof of a final permit, utility commitment, incentive award or completed project.
  • Campus and multi-site program scopes are different. Do not sum overlapping program and campus investment or capacity figures.
  • Publication dates, desk review dates and project milestones have different meanings. An export is not a new source verification.
  • Unknown or undisclosed values remain unknown; locality markers are approximate and do not establish parcel jurisdiction.

Controlling documents