Segra: North Carolina data-center operator.
The desk's source-governed infrastructure records for this operator. Individual campuses and multi-site investment programs retain their own scope and uncertainty.
Segra has 5 campus or program records in the selected North Carolina register. This count does not establish the operator’s full North Carolina footprint, operating capacity, or total investment.
- Segra Charlotte 1 facility
- Segra lists its Charlotte 1 facility at 3100 International Airport Dr, Charlotte, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.
- Segra Charlotte 2 facility
- Segra lists its Charlotte 2 facility at 3101 International Airport Dr, Charlotte, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.
- Segra Raleigh facility
- Segra lists its Raleigh facility at 2100 Garner Station Blvd, Raleigh, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.
- Segra Winston-Salem building
- Segra lists its Winston-Salem building at 3310 Old Lexington Rd, Winston-Salem, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.
- Segra Kannapolis facility
- Segra lists its Kannapolis facility at 465 Charles Babbage Ln, Kannapolis, NC; the record preserves the operator’s facility scope and the documented county jurisdiction.
| Project / program | Operator | Locality | Investment | Power | Conf. |
|---|---|---|---|---|---|
| Segra Charlotte 1 facility Operator-listed colocation facility · campus · reviewed | Segra | Mecklenburg County | Not disclosed in reviewed facility entry | 500 kW — operator specification | B |
| Segra Charlotte 2 facility Operator-listed colocation facility · campus · reviewed | Segra | Mecklenburg County | Not disclosed in reviewed facility entry | 2.5 MW — operator specification | B |
| Segra Raleigh facility Operator-listed colocation facility · campus · reviewed | Segra | Wake County | Not disclosed in reviewed facility entry | 2.5 MW — operator specification | B |
| Segra Winston-Salem building Operator-listed colocation facility · campus · reviewed | Segra | Forsyth County | Not disclosed in reviewed facility entry | 6 MW — operator specification | B |
| Segra Kannapolis facility Operator-listed colocation facility · campus · reviewed | Segra | Cabarrus County | Not disclosed in reviewed facility entry | 2.5 MW — operator specification | B |
Campus and multi-site program records are kept distinct. Investment and power figures are not summed across overlapping scopes.