Lee County: the source trail.
Campus records that explicitly name this locality in the reviewed register. A location reference is not a permit, utility commitment, or verified parcel boundary.
Quick answer
Lee County had an estimated 70,258 residents on July 1, 2025, ranking 41 of North Carolina’s 100 counties (+11.0% since the April 2020 estimates base) [Census Vintage 2025]. Its 2024 labor force averaged 30,565 people, 29,483 employed and 1,082 unemployed, a 3.5% unemployment rate [BLS LAUS 2024]. It covers 255 square miles of land [Census Gazetteer] and borders 3 North Carolina counties [Census adjacency]. It sits in the N.C. Commerce North Central Prosperity Zone [N.C. Commerce], which this desk files under its Research Triangle region. 1 data-center record in the reviewed register explicitly names Lee County; see the table and source trail below.
- County FIPS code
- 37105
- Land area
- 255.1 sq mi
- Water area
- 4.1 sq mi
- Internal point
- 35.4763, -79.1721
1 selected campus records. Other projects may exist outside the desk’s reviewed coverage.
| Project / program | Operator | Locality | Investment | Power | Conf. |
|---|---|---|---|---|---|
| CyrusOne Lee County proposal In development — proposed first-phase building · campus · reviewed | PointOne / CyrusOne | Lee County | Current site expenditure not verified in reviewed sources | 90 MW first-phase critical IT — operator specification | B |
Campus and multi-site program records are kept distinct. Investment and power figures are not summed across overlapping scopes.
Research guides on Lee County
- North Carolina AI companies and their infrastructure
A source-linked guide to the technology operators with disclosed North Carolina data-center and AI infrastructure footprints, and how to verify each claim.
- Research Triangle AI: North Carolina’s research base
How Duke, UNC-Chapel Hill, NC State and Research Triangle Park describe their own AI work, with links to each primary page.
- Duke Energy and North Carolina data-center power demand
What Duke Energy’s 2025 Carolinas Resource Plan and the NC Utilities Commission say about load growth driven by large customers such as data centers.
- Track North Carolina data centers through primary sources
A practical evidence sequence for campus announcements, local approvals, power, environmental records and investment disclosures.