- Operator
- PointOne / CyrusOne
- Locality
- Lee County
- Status
- In development — proposed first-phase building
- Investment disclosure
- Current site expenditure not verified in reviewed sources
- Power disclosure
- 90 MW first-phase critical IT — operator specification
- Jobs disclosure
- Current site employment not verified in reviewed sources
- Record type
- campus
- Region
- triangle
Map position: Approximate Lee County Census Gazetteer internal point; not the campus location or parcel boundary.
PointOne’s current location page identifies Lee County and a 430-acre multiphase property. It describes phase one as a single 90 MW critical-IT building being built for CyrusOne, with later phases dependent on significant infrastructure upgrades. [PointOne]
CyrusOne’s facility page gives 4079 Lower Moncure Road, Sanford, Lee County, and describes the facility as in development. [CyrusOne]
Sanford’s June 25, 2026 Technical Review Committee agenda identifies item TRC-06-31-26 at that address, 428.85 acres, one proposed building, fire-water tank and pump house. The municipal acreage is more precise than the operator’s rounded 430 acres. [City of Sanford]
The 90 MW figure belongs to the first-phase critical-IT building described by PointOne. It is not a sum across the multiphase property or evidence of energized utility demand. [PointOne]
Project status and disclosures are attributed to the cited source. Announced investment is not proof of expenditure, and utility capacity is not inferred from computing or building capacity.