- Operator
- Core Scientific
- Locality
- Cherokee County
- Status
- Operating and billing — remainder was due in H1 2026 (April 2026 SEC filing)
- Investment disclosure
- Not disclosed in cited source
- Power disclosure
- 65 MW critical IT; 117 MW grid capacity — SEC filing
- Jobs disclosure
- Not disclosed in cited source
- Record type
- campus
- Region
- western
Map position: Approximate Cherokee County Census Gazetteer internal point; not the campus location or parcel boundary.
The filing describes the campus as about 73 acres being converted from cryptocurrency mining to HPC and AI workloads, with 117 MW of grid capacity and 61,440 square feet of IT whitespace. It reports 37 MW billable as of March 2026 (57% completion) and substantial completion of the rest expected in the first half of 2026; this record has not verified that completion. [Core Scientific, Inc. (SEC EDGAR)]
CoreWeave’s licensed allocation at Marble is 65 MW, with an initial 12-year term and two five-year extension options; base license fees have commenced. Construction is managed by T5 under a cost-plus contract with a guaranteed maximum price. [Core Scientific, Inc. (SEC EDGAR)]
Power comes through three contracts: 35,000 kW of firm service from Murphy Electric Power Board, a Tennessee Valley Authority distributor, running through August 30, 2029; and two Duke Energy Carolinas electric service agreements, one with 48,000 kW of contract demand and one beginning at 34,000 kW, both year to year. [Core Scientific, Inc. (SEC EDGAR)]
Core Scientific’s campus page lists 117 MW of total power capacity and a 70-acre campus footprint; the SEC filing gives about 73 acres. Neither names the county: the U.S. Census Bureau geocoder places 155 Palmer Lane, Marble in Cherokee County. [Core Scientific] [U.S. Census Bureau]
Project status and disclosures are attributed to the cited source. Announced investment is not proof of expenditure, and utility capacity is not inferred from computing or building capacity.